+
  • undefined
  • undefined
  • undefined

Paver accessories chrome plated shaft

Large pipe application: used for a paving engineering machinery compaction paver (also called vibratory roller, roller, paving machine, etc.) products, guide column components; Features: It is a kind of high-precision shaft tube parts, with large tube specifications, integral grinding of outer circle, installation holes and positioning holes in the inner holes and end faces of both ends, and the main processing difficulties are large in specifications, long in length, and high in shaft roundness and cylinder requirements, the installation holes at both ends have angular requirements, and it is difficult to ensure their positions. Large pipe process requirements: blanks are generally made of customized thick-walled steel pipes. The main processes include: chamfering of inner holes-rough turning outer circle-finish turning outer circle-tapping of end face holes-grinding-electroplating-fine grinding and other processes. The main processing equipment includes numerical control lathes, cylindrical grinding machines, drilling machines (or processing centers) and other equipment. Key inspection items: surface roughness, roundness, cylindricity, coaxiality, position and other items; Key inspection equipment: special position inspection tools, large and medium-sized precision coordinate measuring machines and other high-precision inspection and test equipment.

Key words:

Product Classification:

Construction Machinery Accessories

Product Details


 
 
 
 
Material:
Steel Q345
Type:
Shaft
Applicable model:
Compaction and paving equipment
Certificate:
ISO9000,TS16949
Packing:
Bubble packaging Wood packaging
Guarantee:
3 months
Experience:
30 years
Delivery time:
15-45 working days
 
 
 
 
 
 

Large pipe use: used for a paving engineering machinery compaction paver (also called vibratory roller, roller, paver, etc.) products, guide column components;

Features: It belongs to a kind of high-precision shaft and tube parts. The tube has a large specification, and the outer circle is integrally ground. The inner holes and end faces at both ends are provided with mounting holes and positioning holes. The main processing difficulties are large in specification, long in length, high in roundness and cylindricity of the shaft. The mounting holes at both ends have angular requirements and are difficult to ensure the position;
Requirements for large pipe process: blanks are generally made of customized thick-walled steel pipes. The main processes include: chamfering of inner holes-rough turning excircle-finish turning excircle-drilling end face holes, tapping-grinding-electroplating-finish grinding and other processes. The main processing equipment includes numerical control lathes, cylindrical grinding machines, drilling machines (or processing centers) and other equipment.
Key inspection items: surface roughness, roundness, cylindricity, coaxiality, position and other items; Key inspection equipment: special position inspection tools, large and medium-sized precision coordinate measuring machines and other high-precision inspection and test equipment.

 


Related Products


Jinglian Qualification

Patent Certificate
Safety production standardization certificate
Business License
Excellent Supplier
Hebei Industrial Enterprise R & D Institution Certificate
IATF 16949:2016 Certificates

Jinglian Machinery Manufacturing Co., Ltd.


Send mail

24-hour product hotline

Telephone/Fax:+86 318 7461330 

business negotiation

Production Park

Raoyang County Wugong Town Industrial Development Zone

Feedback

Our technicians will contact you within 12 hours and provide free plans and quotations.

Copyright©2023 Jinglian Machinery Manufacturing Co., Ltd.